Reconstruction of the 9th floor of the Holiday Inn hotel and transformation into a leisure area with indoor pool and restaurant. Includes demolition works, construction of soundproof flooring infrastructure, pool concrete works, dry wall works, floor laying, construction of suspended ceilings, installation of frames, painting, wall cladding with tiles – marbles, finishes and installation of wood works and decorative elements.